The frame design needed to work with the structural challenges, installation program as well as coordinate with other trades onsite.
6.5MW 4-Storey Data Centre
Design, manufacture, and installation of framed pipe modules that fed rooftop chillers and the data halls
The Challenge
The Solution
We designed the frame with an integrated walkway allowing the pipe headers to be installed under the walkway. This allowed clear access to all chillers during commissioning and ongoing maintenance.
The frames were all manufactured, assembled and tested for fit in our controlled environment offsite prior to being shipped to site for installation.
The Result
“PFS provided a turnkey solution to us and our client for a major data centre project in northern Sydney. The engineering, project management and site teams worked closely with ours to deliver prefabricated mechanical services modules ahead of time, on budget whilst maintaining a high level of safety.”